I would like to know if there is a way to set the order in-which crons (@daily) can be ran.
I know that I could move them to start are designated times (opposed to using @daily) but am hoping there is a way to do this without going the latter route.
Not sure, I’ll have a look. In the interim, I did a reorg of the @daily from A - Z. While not all the jobs process chronologically, it is close enough to produce satisfactory results for now.
I’ll go ahead and mark this solved and if I come up with a solid solution, I’ll edit.
Thanks all for looking into this.